Opening the Main Tunnel in Onaiza Interchange as Part of Lusail ...
01 April 2017
-
The opening was in attendance of H.E. Dr. Eng. Saad bin Ahmad Al Muhannadi, President of the Public Works Authority, and a number of senior officials from the Ministry of Transportation and Communication, from the Public Works Authority and from the General Directorate of Traffic in the Ministry of Interior.
-
The opening was in attendance of H.E. Dr. Eng. Saad bin Ahmad Al Muhannadi, President of the Public Works Authority, and a number of senior officials from the Ministry of Transportation and Communication, from the Public Works Authority and from the General Directorate of Traffic in the Ministry of Interior.
-
H.E. Dr. Eng. Saad bin Ahmad Al Muhannadi President of the Public Works Authority, speaking to the media during the opening event
-
Engineer Abdulla Bin Hamad Al-Attiyah, Assistant President, speaking to the media
-
Engineer Yousef Al-Emadi, Manager of Highway Projects Department, explaining the benefits of Onaiza tunnel and Lusail expressway to the media
-
Ashghal opened the main tunnel on Onaiza Interchange to traffic
-
The tunnel is located at the traffic lights of Onaiza Interchange (Doha Exhibition Centre traffic lights) and it stretches until the signal-controlled intersection in front of the Cultural Village “Katara”.
-
The tunnel is 630 metres long and about 1 kilometre long with the access roads leading to it from south and north.
-
Three lanes were open from four lanes in each direction
-
The live traffic at the tunnel