As part of the Expressway Programme this project will upgrade the existing East Industrial Road from the south of the Industrial Interchange up to the existing roundabout at the junction of East Industrial Road and Rawdat Al Khail Street.
The mainline road is 3.5 km in length comprising of a six lane divided carriageway, (three lanes in each direction) to provide free flow for the mainline traffic, including the provision of two new interchanges and two new interchanges.
Local traffic movements will be catered for through a two lane service road network. Additional features include: A temporary emergency flood area will be utilized to drain the surface water flow. Other infrastructure installation works include, relocation of foul sewage rising main pipelines, street lighting, traffic signs, road markings and traffic light systems, electrical and telecommunications system relocation, guard rails/barrier walls and landscaping works.