The project is divided to six packages, three of them are currently under construction which are packages 1, 2 and 6. The project provides essential improvements to the surface and ground water drainage system, in addition to the efficient sewage system which will meet all basic needs to improve work and life conditions for residents and business owners in Doha’s Industrial Area.
The project will provide a safer roads network and better traffic flow through upgrading roads, providing signal-controlled intersections, multi-level interchanges, pedestrians and cyclists paths, street lighting, in addition to landscaping and beautification.