Search
Advanced Search
  • Login
  • Register
    • Register as an Individual
    • Register as a Company
    • Register as a Government
  • Register as a Turkish Manufacturer
  • Contact Us
  • Site Map
  • Home
  • About Us
    • Overview of Ashghal
    • President's Message
    • Organisation Chart
    • Mission, Vision & Values
  • Our Projects
    • Overview
    • Roads
    • Buildings
    • Drainage
  • Tenders & Auctions
    • Overview
    • The Unified Website of State Procurement - Monaqasat
    • List of Projects to be launched in 2025
    • General Tenders
    • e-Tenders (GTC/STC)
    • e-Tenders Registration
    • e-Tendering User Guide
    • Participation Terms
    • Awarded Tenders
    • Pre-Qualifications - Expression Of Interests
  • Contractors e-Payment
    • APMS
    • Non-Construction Payments
  • Media Hub
    • Overview
    • Our News
    • Photo Gallery
    • Video Gallery
    • Events & Activities
    • Email Alerts & SMS
  • Work Environment
  • Customer Zone
    • E-Services
    • Other Services
Follow
javascript: SP.SOD.executeFunc('followingcommon.js', 'FollowDoc', function() { FollowDoc('{ListId}', {ItemId}); });
0x0
0x0
ContentType
0x01
1100
Compliance Details
javascript:if (typeof CalloutManager !== 'undefined' && Boolean(CalloutManager) && Boolean(CalloutManager.closeAll)) CalloutManager.closeAll(); commonShowModalDialog('{SiteUrl}'+ '/_layouts/15/itemexpiration.aspx' +'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/hold.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Reporting.aspx' +'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/expirationconfig.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'tag') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Hold.aspx' +'?Tag=true&ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=43
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+ '/_layouts/15/DocSetVersions.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=43
javascript:GoToPage('{SiteUrl}' + '/_layouts/15/docsetsend.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350

Ashghal > Home > Our Projects Project Videos
  • Overview
  • Roads
    • Expressway Programme
    • Local Roads
  • Buildings
  • Drainage
    • Drainage Projects
    • Infrastructure Projects

Ain Khaled& musaimeer Sewage

07 April 2016
The Project includes design and the construction of drainage network in Ain Khaled and Mesaimeer with a total length of 240 km and with a 9100 house connections.
Play
Ain Khaled& musaimeer Sewage
07 April 2016
Ain Khaled& musaimeer Sewage
07 April 2016
https://www.youtube.com/embed/67MxoOIQWRg
The Project includes design and the construction of drainage network in Ain Khaled and Mesaimeer with a total length of 240 km and with a 9100 house connections.
Play
Mesaimeer Surface and Ground Water Drainage Project
06 April 2016
Mesaimeer Surface and Ground Water Drainage Project
06 April 2016
https://www.youtube.com/embed/hFLRODRNppc
Completion of the Main Tunnel Excavation Works for Mesaimeer Surface and Ground Water Drainage Project
The Public Works Authority ‘Ashghal’ announced that excavation works for the main tunnel of the Mesaimeer Surface and Ground Water Drainage Project were completed at the end of July 2015.
The project will discharge the ground water and stormwater into the sea thus decreasing the surface water level. This will in turn contribute to the reduction of pumping costs and to the disposal of ground water in construction projects around the country.
The excavation works were carried out by “Al Thumama” and “Al Rawada” Tunnel Boring Machines (TBM). Named after the areas they operated in, the two TBMs were specially designed and developed for this project by the German manufacturing company “Herrenknecht AG”, and were used for the first time in Qatar to excavate deep tunnels.
It is worth mentioning that the main tunnel is approximately 10 km long and reaches a depth of approximately 30 m
Play
Musaimeer and Ain Khalid Sewage Project
15 November 2012
Musaimeer and Ain Khalid Sewage Project
15 November 2012
https://www.youtube.com/embed/67MxoOIQWRg
The Project includes design and the construction of drainage network in Ain Khaled and Mesaimeer with a total length of 240 km and with a 9100 house connections.

Contact Center

188

Follow us

Ashghal's Mobile App

Ashghal 24/7

  • Home
  • Tenders & Auctions
  • Customer Zone
  • Accessibility
  • Privacy
  • Site Map
  • Contact Us
  • Subscribe to Email Alerts & SMS
  • About Us
  • Our Projects
  • Media Hub
  • Work Environment
  • Social Media
  • Terms and Conditions
  • Ashghal staff portal

All Rights Reserved - Ashghal ©

I am Shaghool.

I am here to help you.

.انا شغول

.أنا هنا لمساعدتك

Chat
أهلا و مرحبا إلى بوابة خدمات شغول
Hello and welcome to the Shaghool Portal

By chatting with our bot, you accept that this conversation will be stored. The conversation will be reviewed strictly for quality purpose and it will not be shared by any other system of Ashghal.