The F-Ring Road is part of the Expressway Programme and is a new road between Rawadt Al Khail Street and Al Matar Street providing access to the new Doha International Airport.
The project includes the construction of a new 8.7 km expressway comprising of six to eight lanes (three to four lanes in each direction) divided by a median with ramps and service roads at the Intersections.
There are two interchanges:
•Al Matar street
•Najma street extension.
Local traffic movement is catered through two-lane frontage roads adjacent to the main carriageway.
The project includes:
1.Utility upgrading and relocation.
2.Traffic signals at two new intersections.
3.Relocation of the foul sewage rising main pipelines.
4.A new treated effluent sewerage system.
5.Protection of the existing gas & oil pipelines.
6.A new positive storm water drainage system.