Upgrading of 6 pumping stations 15, 31, 3/1, 8/1, 8/6, PS 44 and construction of 1 pump station PS 23 (demolished old and construct a new one in another location). Project included upgrading and construction of 7 pumping stations.
Construction of Rising Main at PS 31, 15 & 23, with a total length around 5 KM. Rising main of PS 31: around 3 KM, PS 15 around 1 KM, PS 23 : around 0.570 KM and PS 8/1: around 0.265 KM.
Sewer Lines at PS 23: around 570 M and PS 31: around 114 M.