Upgrading Roads Around Al-Bayt Stadium in Al-Khor

Brief description

The project features the construction of roads leading to the stadium from four directions, as well as providing multiple entrances to the Sports Complex.

Benefits
  • Constructing roads at a total length of 13 km, 5.4 km of which are roads surrounding Al Bayt Stadium from the four sides and consisting of three lanes in each direction.
  • The roads provide direct connection with main roads such as Al-Khor Road and Al Egda Street.
  • Constructing 6 entrances with traffic lights to regulate movement of cars, & 19 designated bus entrances.
  • Constructing 11 km of shared pedestrian and cycle paths.
  • Installing lighting systems using energy saving LED lights and ITS systems, in addition to afforestation and landscaping.
  • Developing Al-Egda Street and constructing a pedestrian path on its sides.
  • Constructing a sewage network, a stormwater drainage network and an irrigation network using TSE.
Project Information
Geographical Location N/A
Area Al Khor
Sector Infrastructure Projects
Total Cost 379,306,184 Q.R.
Status In progress
Type Drainage
Start Date 01 September 2017
Expected completion date Fourth quarter of 2020
Construction company

Bin Omran Trading & Contracting Company

Consulting company

Parsons International Ltd