22 September 2016
Al Sheehaniya-Leatooriya Road open to Traffic
Al Sheehaniya-Leatooriya Road open to Traffic
22 September 2016
https://www.youtube.com/embed/w6g5np7NPTM
Al Sheehaniya-Leatooriya Road is a main linking route, extending 13 km from Dukhan Highway and Al Sheehaniya Camel Race Track to the regional town of Leatooriya. It is part of the 29-km Al Sheehaniya – Leatooriya – Lijmiliya Road expressway project.
The video illustrates the Al Sheehaniya-Leatooriya Road latest upgrade to have the road been opened to traffic: two-lane expansion, new water, power and communication lines, safety measures, including guardrails, rumble strips, 300 street lights, high-visibility lane markings and speed cameras