Search
Advanced Search
  • Login
  • Register
    • Register as an Individual
    • Register as a Company
    • Register as a Government
  • Register as a Turkish Manufacturer
  • Contact Us
  • Site Map
  • Home
  • About Us
    • Overview of Ashghal
    • President's Message
    • Organisation Chart
    • Mission, Vision & Values
  • Our Projects
    • Overview
    • Roads
    • Buildings
    • Drainage
  • Tenders & Auctions
    • Overview
    • The Unified Website of State Procurement - Monaqasat
    • List of Projects to be launched in 2025
    • General Tenders
    • e-Tenders (GTC/STC)
    • e-Tenders Registration
    • e-Tendering User Guide
    • Participation Terms
    • Awarded Tenders
    • Pre-Qualifications - Expression Of Interests
  • Contractors e-Payment
    • APMS
    • Non-Construction Payments
  • Media Hub
    • Overview
    • Our News
    • Photo Gallery
    • Video Gallery
    • Events & Activities
    • Email Alerts & SMS
  • Work Environment
  • Customer Zone
    • E-Services
    • Other Services
Follow
javascript: SP.SOD.executeFunc('followingcommon.js', 'FollowDoc', function() { FollowDoc('{ListId}', {ItemId}); });
0x0
0x0
ContentType
0x01
1100
Compliance Details
javascript:if (typeof CalloutManager !== 'undefined' && Boolean(CalloutManager) && Boolean(CalloutManager.closeAll)) CalloutManager.closeAll(); commonShowModalDialog('{SiteUrl}'+ '/_layouts/15/itemexpiration.aspx' +'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/hold.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Reporting.aspx' +'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/expirationconfig.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'tag') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Hold.aspx' +'?Tag=true&ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=43
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+ '/_layouts/15/DocSetVersions.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=43
javascript:GoToPage('{SiteUrl}' + '/_layouts/15/docsetsend.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350

Ashghal > Home > Our Projects Project Videos
  • Overview
  • Roads
    • Expressway Programme
    • Local Roads
  • Buildings
  • Drainage
    • Drainage Projects
    • Infrastructure Projects

F-Ring Road

14 November 2012
The F-Ring Road is part of the Expressway Programme and is a new road between Rawadt Al Khail Street and Al Matar Street providing access to the new Doha International Airport.

The project includes the construction of a new 8.7 km expressway comprising of six to eight lanes (three to four lanes in each direction) divided by a median with ramps and service roads at the Intersections. 
 
There are two interchanges:
•Al Matar street
•Najma street extension.
 
Local traffic movement is catered through two-lane frontage roads adjacent to the main carriageway.
 
The project includes:
1.Utility upgrading and relocation.
2.Traffic signals at two new intersections.
3.Relocation of the foul sewage rising main pipelines.
4.A new treated effluent sewerage system.
5.Protection of the existing gas & oil pipelines.
6.A new positive storm water drainage system.
Play
F-Ring Road
14 November 2012
F-Ring Road
14 November 2012
https://www.youtube.com/embed/9zvnLn_4AS8
The F-Ring Road is part of the Expressway Programme and is a new road between Rawadt Al Khail Street and Al Matar Street providing access to the new Doha International Airport.

The project includes the construction of a new 8.7 km expressway comprising of six to eight lanes (three to four lanes in each direction) divided by a median with ramps and service roads at the Intersections. 
 
There are two interchanges:
•Al Matar street
•Najma street extension.
 
Local traffic movement is catered through two-lane frontage roads adjacent to the main carriageway.
 
The project includes:
1.Utility upgrading and relocation.
2.Traffic signals at two new intersections.
3.Relocation of the foul sewage rising main pipelines.
4.A new treated effluent sewerage system.
5.Protection of the existing gas & oil pipelines.
6.A new positive storm water drainage system.

Contact Center

188

Follow us

Ashghal's Mobile App

Ashghal 24/7

  • Home
  • Tenders & Auctions
  • Customer Zone
  • Accessibility
  • Privacy
  • Site Map
  • Contact Us
  • Subscribe to Email Alerts & SMS
  • About Us
  • Our Projects
  • Media Hub
  • Work Environment
  • Social Media
  • Terms and Conditions
  • Ashghal staff portal

All Rights Reserved - Ashghal ©

I am Shaghool.

I am here to help you.

.انا شغول

.أنا هنا لمساعدتك

Chat
أهلا و مرحبا إلى بوابة خدمات شغول
Hello and welcome to the Shaghool Portal

By chatting with our bot, you accept that this conversation will be stored. The conversation will be reviewed strictly for quality purpose and it will not be shared by any other system of Ashghal.